Controlled operating procedure
Start-up and shutdown of P-105
OP-300-18
Rev B
Rev B
4.2 Starting P-105
36
Confirm the suction isolation valve is fully open.
37
Confirm the pump casing is vented and filled with process liquid.
38
Confirm P-105 discharge valve is open before starting the pump.
38
Confirm the discharge path to V-310 is open and PSV-105A is in service before starting P-105.
39
Start P-105 from the local control station.
40
Verify stable flow and record discharge pressure.